还没有账号立即注册
登录即代表您已同意《leyu·乐鱼(中国)体育官方网站隐私政策》
忘记密码?登录即代表您已同意《leyu·乐鱼(中国)体育官方网站隐私政策》
忘记密码?已有账号登录账号
Positioning
Sky survey APS is based on the production site of equipment and tools, materials, production work orders, orders and product manufacturing process, as well as production scheduling time, with the dispatch rule, under the premise of meeting resource constraints, balance the production of various production resources in the production process, in different production processes to give the most production scheduling plan, in order to achieve rapid alignment of demand changes in a rapid response.
Value proposition:
APS simulates the estimated completion date of each work order and the production and manufacturing situation of each process and each equipment every day through scheduling algorithm, and further obtains the daily production plan, so as to realize the virtual chemical plant of the computer system and fully automatic production scheduling.
The core function modules of APS system include: order signing and production, supply and demand balance, production scheduling, production scheduling, delivery simulation, report analysis system and so on.
Sky survey APS system is an automatic scheduling system that can support work order and equipment level in the electronic circuit board and IC packaging substrate industry. It has been widely used in many leading enterprises in the industry, which can significantly improve the operation rate of equipment resources and optimize the delivery rate of products. After more than ten years of experience in the industry, APS scheduling system integrates a large number of production rules that meet the characteristics of the industry, and can be quickly imported and launched.
We can provide closely coordinated on-site services and support for enterprises across the country.
Immediately consultProvide closely coordinated on-site services and support for enterprises.
Make an appointment now